NAME DATE START: END: Bottles Dir- Location Tow/ 1995 Time Latitude longitude time latitude longitude ection Vert GMT hhmm deg mins deg mins hhmm deg mins deg mins T02 29-May 0650 47 59.692 129 06.056 0832 47 58.075 129 06.596 05 ne-sw W of ridge; N of HiRise to S of MEF T03 30-May 0616 48 00.929 129 04.487 1115 47 55.187 129 05.996 11 ne-se "W of ridge, then across axis S of H2 anom." V04 31-May 0600 47 56.851 129 05.863 0832 47 58.072 129 06.598 07 MEF V05 31-May 0850 47 56.462 129 06.527 0909 47 56.473 129 06.505 06 1 km down-current(?) from MEF T06 01-Jun 0639 48 01.641 129 02.751 1144 47 57.380 129 06.188 11 ne-sw Atop W ridge; far N to near MEF T07 02-Jun 0440 48 02.293 129 02.503 0720 47 59.527 129 04.232 00 ne-sw N central valley; furthest N to N of HiRise T08 03-Jun 0213 48 01.255 129 03.091 0528 47 58.361 129 04.933 03 ne-sw N central velley; N of volcano to S of HiRise T09 03-Jun 1026 47 59.935 129 04.453 1213 47 58.738 129 05.327 04 ne-sw Atop W ridge; volcano to N of HiRise T10 06-Jun 1826 47 59.473 129 03.841 0059 47 54.286 129 06.678 00 ne-sw Central valley/W wall HiRise to H2 T11 05-Jun 0149 47 59.408 129 04.012 0301 47 59.229 129 05.317 00 e-w Northernmost cross axis T12 05-Jun 0521 47 59.227 129 03.948 0648 47 59.059 129 05.516 01 e-w Middle N cross axis T13 05-Jun 0830 47 59.092 129 03.628 1037 47 58.843 129 05.743 02 e-w Southern N cross axis T17 08-Jun 0204 47 57.599 129 04.994 0343 47 58.856 129 06.808 00 se-nw "Across axis and ridge, just S of HiRise" T18 08-Jun 0545 47 57.950 129 03.231 0732 47 58.643 129 05.315 00 se-nw "Across axis and ridge, N of HiRise" V19 08-Jun 0922 47 56.529 129 06.176 0952 47 56.636 129 05.567 10 MEF T20 09-Jun 0345 47 54.332 129 04.811 0652 47 55.349 129 08.899 00 se-nw "Across ridge, furthest S of H2" V21 09-Jun 1002 47 56.880 129 05.975 1019 47 56.905 129 05.958 10 T22 10-Jun 0120 48 03.732 128 26.812 not navigated 00 "Dot" seismic area, far E of ridge V23 11-Jun 0805 47 56.968 129 05.516 0918 47 56.450 129 06.103 11 T24 12-Jun 0228 47 58.564 129 07.158 0514 47 55.566 129 06.251 00 T25 13-Jun 0814 47 57.454 129 05.387 1159 47 54.260 129 08.630 10 T26 14-Jun 0159 47 59.554 129 04.853 0601 47 55.228 129 07.553 00 T27 14-Jun 0903 47 56.887 129 05.823 1143 47 57.806 129 09.428 07 T28 15-Jun 0522 47 55.500 129 06.784 0835 47 58.547 129 06.709 10 T29 16-Jun 0457 47 58.567 129 04.568 0704 47 56.457 129 07.297 00
--SRV